top of page

French Drain Continues

Construction of the French drain continues. Chris had 10 yards of 2-inch drainage rock delivered. She lined the ditch with fabric cloth and temporarily secured it around the edges with wooden barbeque skewers. Then she began filling the ditch with gravel. Next, she's laying corrugated piping onto the layer of gravel as shown in the second photo.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page