French Drain Digging Phase One

August 22, 2015

 

Today Chris finished digging 140 feet of French drain.  It took 50 to 60 hours with the Kubota, plus some extra hours of manual digging out large rocks and grading. We'll do another 140 feet or so next year. The ditch is 2 feet wide, 2 feet deep. That boulder we dug out of the ditch is put to good use in the rock garden. Our next step is to fill this portion of the ditch with gravel, fabric cloth, piping, and soil.

 

 

 

 

Please reload

Featured Posts

Wildfire Sunsets

July 20, 2015

1/1
Please reload

Recent Posts

September 18, 2015

August 29, 2015

July 20, 2015

July 12, 2015

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • w-facebook
  • w-googleplus
  • Twitter Clean

Copyright 2015-2018 Dungeness Chestnuts